§ 99.30. Building and zoning fees.  


Latest version.
  • (A)

    The city is authorized to charge a fee for each of the permits set forth in division (B) below.

    (B)

    The permits for which the city shall charge a fee and the amount of the fee for each permit are as follows:

    (1)

    Building permits

    RESIDENTIAL BUILDING—ONE-FAMILY AND TWO-FAMILY DWELLING

    (a)

    New structure, per 1,000 total valuation .....$4.10

    Minimum .....40.00

    (b)

    Remodel, per 1,000 total valuation .....6.00

    Minimum .....40.00

    (c)

    Accessory structure, per 1,000 total valuation .....6.00

    Minimum .....40.00

    (d)

    Roof/re-roof .....40.00

    (e)

    Plan review, per 1,000 total valuation .....0.40

    Minimum .....40.00

    COMMERCIAL BUILDING

    (a)

    New structure, per 1,000 total valuation .....5.75

    Minimum .....50.00

    (b)

    Additions, per 1,000 total valuation .....7.00

    Minimum .....50.00

    (c)

    Remodel, per 1,000 total valuation .....7.00

    Minimum .....50.00

    (d)

    Accessory structure, per 1,000 total valuation .....7.00

    Minimum .....50.00

    (e)

    Roof/re-roof, per 1,000 total valuation .....7.00

    Minimum .....50.00

    (f)

    Plan review, per 1,000 total valuation .....1.25

    Minimum .....100.00

    (g)

    Occupancy permit .....50.00

    (h)

    Other, per 1,000 total valuation .....7.00

    Minimum .....50.00

    MECHANICAL AND MISCELLANEOUS

    (a)

    Plumbing—New structure, additions and alterations .....40.00

    Plus, per 1,000 total valuation .....0.70

    (b)

    HVAC—New structure, additions, and alterations .....40.00

    Plus, per 1,000 total valuation .....0.70

    (c)

    Electric—New structure, additions, and alterations .....40.00

    Plus, per 1,000 total valuation .....0.70

    (d)

    Gas—New structure, additions, and alterations .....40.00

    Plus, per 1,000 total valuation .....0.70

    (f)

    Mobile home set-up fee—New structure, include building only .....50.00

    Electrical, mechanical and plumbing require separate permits as needed.

    (g)

    Demolition fee:

    1.

    For the first 2,000 sq. ft. of all floor area with no utilities .....40.00

    And per 1,000 sq. ft. of floor area thereafter .....15.00

    2.

    For the first 2,000 sq. ft. of all floor area with no utilities .....70.00

    And per 1,000 sq. ft. of floor area thereafter .....25.00

    (h)

    Reinspection fee .....40.00

    (i)

    Double fee required for all work started prior to permit issuance.

    (2)

    Driveway permits

    Residential .....20.00

    Commercial .....30.00

    (3)

    Pest control pretreatment permit .....10.00

    (4)

    Fence installation

    Commercial installation permit, per permit .....25.00

    (5)

    Irrigation system permit

    Per permit .....10.00

    The above fee amounts notwithstanding, the fee for any required permit for work with a value of less than $300.00 shall be $10.00 for each required permit.

    Any person failing to obtain any of the above listed building permits, if required or if necessitated by the project, prior to commencement of construction shall be charged double the charge shown above for each required permit which the person failed to timely obtain.

    (6)

    Comprehensive plan amendment procedure

    (a)

    Application fee, per application .....300.00

    (b)

    Advertising and mailing .....Actual Cost

    (c)

    Consultant charges .....Actual Cost

    (7)

    Annexations

    (a)

    Application fee, per application .....200.00

    Fee may be waived by city commission if annexation is requested by city.

    (b)

    Advertising and mailing .....Actual Cost

    (c)

    Consultant charges .....Actual Cost

    (8)

    Zoning/rezoning procedure

    (a)

    Application fee, per application .....115.00

    (b)

    Advertising and mailing .....Actual Cost

    (c)

    Consultant charges .....Actual Cost

    (9)

    Special exception and conditional uses

    (a)

    Application fee, per application .....200.00

    (b)

    Advertising and mailing .....Actual Cost

    (c)

    Consultant charges .....Actual Cost

    (10)

    PUD/public facilities district review procedure

    (a)

    Application fee, per application .....300.00

    (b)

    Advertising and mailing .....Actual Cost

    (c)

    Consultant charges .....Actual Cost

    (11)

    Subdivision procedure fees

    (a)

    Application/preliminary plat approval, plus $5.00 per lot per application .....150.00

    (b)

    Advertising and mailing .....Actual Cost

    (c)

    Final plat approval, plus $1.00 per lot per plat .....100.00

    (d)

    Subdivision on site inspection fee, plus $1.00 per lot per application .....100.00

    (e)

    Consultant charges .....Actual Cost

    (12)

    Variance procedure fees

    (a)

    Application fee, per application .....100.00

    (b)

    Advertising and mailing .....Actual Cost

    (c)

    Consultant charges .....Actual Cost

    (13)

    Vacation procedure

    (a)

    Application fee, per application .....100.00

    (b)

    Advertising and mailing .....Actual Cost

    (c)

    Consultant charges .....Actual Cost

    (14)

    Clearing permit

    Application fee, per application .....25.00

    (15)

    Tree removal permit

    Application fee, per application .....25.00

    (16)

    Sign permits

    (a)

    Individual commercial, office or industrial uses, per sign .....10.00

    (b)

    Shopping centers/Multitenant complexes, per sign .....10.00

    (c)

    Houses of worship, per site .....10.00

    (d)

    Multifamily development, per sign .....10.00

    (e)

    Off site advertising, per sign .....50.00

    (f)

    Subdivisions, per sign .....10.00

    (g)

    Temporary freestand and portable signs, per sign .....10.00

    (h)

    Temporary banners/exterior wall signs, per sign .....10.00

    (i)

    Temporary real estate signs .....No Charge

    (j)

    Temporary construction real estate signs, per sign .....10.00

    (k)

    Political campaign signs .....No Charge

    (l)

    Miscellaneous temporary .....No Charge

    (m)

    Miscellaneous signs, per sign .....10.00

    (17)

    Sign permit fees (annual renewal)

    (a)

    Off site advertising up to 32 square feet, per sign .....25.00

    (b)

    Off site advertising more than 32 square feet .....50.00

    (18)

    Site plans

    (a)

    Major (plus $4.00 per each 100 square feet of covered floor area in excess of 5,000 square feet) .....250.00

    (b)

    Minor .....100.00

    (c)

    Consultant charges .....Actual Cost

    (19)

    Construction plans

    Consultant charges .....Actual Cost

    (20)

    Concurrency review

    Consultant charges .....Actual Cost

    (21)

    Inspections

    Consultant charges .....Actual Cost

    Depending upon the nature of the development order requested, more than one fee may apply and be charged (e.g., an annexation fee plus a comprehensive plan amendment fee). In addition, fees other than those listed above may be charged to cover the cost of engineering and planning review necessitated by the application (e.g., DRI review fees, site inspection fees). Those additional fees shall be established between the city and the engineer and planner from time to time and charged to the applicant, based upon the fee schedule established. The actual cost of the consultant charges listed above shall be established from time to time by agreement between the city and the city's consultants. A list of the fees established shall be maintained by the city's building department.

(Ord. 90-009, passed 6-14-90; Am. Ord. 92-008, passed 6-11-92; Am. Ord. 92-019, passed 1-14-93; Am. Res. 94-008, passed 4-14-94; Am. Res. 94-019, passed 8-25-94; Am. Res. 96-002, passed 2-8-96; Am. Res. 96-009, passed 3-28-96; Am. Res. 2003-015, passed 5-22-03)